2

Reports: Ability to apply a Master Date Range to all Databoards


Avatar
Ilyas Khan

Currently, the Date Range for the Databaords in Reports have to be manually changed.

User would like to be able to change the Date Range on all the Databoards in Reports in one go so something like a Master Date Range option for the entire Report would be nice. They don't want to change them all manually, as they have many Databoards in Reports.

A

Activity Newest / Oldest

Avatar

Shafaq Zaidi

Merged with: Master Date Range Switch for Reports

Avatar

Ales Kotnik

When editing a Report, I'd like to be able to change the date range on all slides at once, e.g., with a master date range switch.

Use case: An agency/company has scheduled automated monthly reporting. Now they need the same report for a quarterly or an annual meeting. They could just duplicate the existing report and change the date range for all the included metrics (and all slide types) at once.

We could also add an option to select which slides to apply the date range change to, e.g., apply to all slides or apply to selected slides.